Last Updated:
| Status | Connector | Connector Type | Charging Capacity (kWh) | Session Started | Time Since Start |
|---|---|---|---|---|---|
| AVAILABLE | 1A | GB/T LEFT (120 kW) | - | - | - |
| CHARGING | 1B | GB/T RIGHT (120 kW) | 11.210 | 2026-07-09 16:03:24 | 12m |
| AVAILABLE | 2A | CCS2 LEFT (120 kW) | - | - | - |
| AVAILABLE | 2B | CCS2 RIGHT (120 kW) | - | - | - |